In July / August 2010, we transported a 376-to-transformer from Bergkamen to Nürnberg. The transformer had been damaged by a lightning strike a week before the transport and needed to be revised at Siemens Nürnberg.
After a short railway transport, the transformer was rolled onto a roro barge. The transformer and its transport vehicle were then shipped to the port of Nürnberg. The journey ended with a roll-off operation and a short road transport to Siemens.
|