Eguelshard - Drulingen: Cement mill 198 to

In November 2009, we realized the transport of a cement mill, 198 to, from Eguelshard to Drulingen in France. Given the large diameter of the load (6 m) and the resulting position of the centre of gravity, a 3-file trailer was used for the transport.

The transport route included several difficult sections. Among others, our fly-over bridge from Greiner was used. The lashing of the load was carried out with anti-slip mats and a total of 20 chains with a capacity of 16.000 DaN each.

The mill was transported back from Drulingen to Lauterbourg in April 2010.