Trans A.D.M.   |   Transpalux   |   Heinrich Schwertransporte
P-Adams
International Transport Solutions

Transport of 2 reactors 750 t each

In December 2008, two reactors of 750 t each were transportet from Coek in Geel to our heavy-lift terminal in Geel / Westerlo. The transport was carried out using an 18-axle double width trailer with integrated SPMT module.

The biggest difficulty of the transport was the crossing of the E313 motorway, where two steep ramps had to be used.



After the transport to our heavy lift terminal, the two reactors were rolled into a roro-pontoon that carried them to Antwerp, from where they were shipped to Madagascar



Technical drawing